Project Description

BERRI TXARRAK FAREWELLS MADRID WITH A THRILLING CONCERT

Berri Txarrak, a true rock icon with  more than two decades of career and hundreds of concerts inside and outside our borders, announced an indefinite break after their Ikusi Arte Tour. A farewell tour with which numerous cities will enjoy their last stand. On November 9th, it was Madrid’s turn, which turned to the overwhelming live show that the Basque group offered at the WiZink Center in the capital.

The powerful trio launched on stage with the warmth of the public who knew about the band’s indefinite retirement. For about three hours Gorka Urbizu and his people demonstrated their talent with a sober and spectacular staging where the band was the protagonist. As the concert progressed the intensity was increasing until its exciting end, where the group said goodbye to the Madrid public thanking them for their warmth during all these years.

Fluge Audiovisuales provided the sound and lighting equipment of the concert thanks to the trust of Last Tour, its producer.

Next, find the breakdown of the most important equipment:

SONIDO:

SONIDO – P.A. SYSTEM

20 MEYER SOUND LEO
4 MEYERSOUND LYON
12 MEYER SOUND 1100-LFC

SOUND – FRONTFILL

8 MEYERSOUND MELODIE

SOUND – FOH CONTROL

1 DIGICO SD10 iCore2

SOUND – CONTROL MONITORS

1 YAMAHA CL5

SOUND – MONITORS

8 L’ACOUSTIC 112-P

SOUND – SIDEFILL

12 MEYER SOUND MELODIE
2 MEYER SOUND 700-HP

LIGHTING

28 ROBIN BMFL
24 VARI*LITE VL3500
16 CLAY PAKY SHARPY PLUS
8 CLAY PAKY A.LEDA B-EYE K10
2 ROBERT JULIAT ARAMIS 2500

EFFECTS

12 PHILIPS SHOWLINE NITRO 
12 BLINDER 2LITES LINEAL
8 BLINDER 8LITES RECTANGULAR

CONTROL

1 CHAMSYS MAGIGQ MQ80

VÍDEO

1 LED SCREEN OF 12 X 8 METERS AND 6,94 PITCH

CONTROL

1 PRODUCTION SYSTEM WITH TWO CAMERAS